Feed Pellet Assembly Silos

Feed Pellet Assembly Silos

Easy to assemble and disassemble; designed to prevent material buildup inside; sealed against moisture and pests to ensure feed quality; compatible with automated feeding systems; maximum capacity of 2,000 tons per silo.
Contact Us
Contact Us

■ Product Parameters

ItemSpecification
Product NameAssembled Pellet Feed Silo
Application ScenariosLarge-scale livestock farms, feed processing plants, farming park raw material storage, continuous feeding for production lines
MaterialHot-dip galvanized steel plate, zinc coating 275g–600g/㎡
Stored MaterialsPellet feed, corn, soybean meal and other feed raw materials
Storage Capacity per Silo3.8 t – 2000 t
Silo Diameter Range2 m – 10 m
Silo Total Height3 m – 22 m
Structure TypeVertical cylindrical silo, bolted assembly structure
Anti-corrosion TreatmentHot-dip galvanized anti-corrosion treatment, rust-resistant, long service life
Foundation RequirementsSimple concrete independent foundation; foundation design drawings provided by us
Optional AccessoriesSilo roof dust collector, pressure relief valve, manhole, safety ladder with inspection platform, level indicator, temperature monitoring system, etc.
Product AdvantagesEasy to assemble and disassemble, smooth inner surface minimizing material build-up, sealed to prevent moisture and pests, ensuring feed quality, compatible with automated feeding systems, max. 2000 t per silo


■ Logistics Packaging

3b1309fe07f93be7c1b60a337ccc7fea

■ FAQ

Q:What materials can be stored in steel silos?
A:It is suitable for the bulk storage of a wide range of materials—including granular, powdery, and liquid substances—and meets the storage requirements for diverse products such as grain, cement, fly ash, and industrial raw materials.


Q:Can steel silos be customized in size?
A:We offer fully customized solutions and undertake the construction of various steel silo projects, with diameters ranging from 5 to 60 meters, heights from 5 to 48 meters, and storage capacities from 500 to 100,000 tons.


Q:Approximately how long is the construction period?
A:Construction plans are tailored to project dimensions and site conditions; our team is highly experienced and adheres to rigorous construction standards, ensuring efficient delivery and guaranteed project quality.


Q:What is the approximate construction period for a steel silo project?
A:Construction timelines vary based on project specifications, scale, and site conditions. Standard small-to-medium-sized projects are typically completed and handed over within 20 to 40 days, while large-scale, ten-thousand-ton-class storage complex projects follow customized schedules; all projects strictly adhere to the timelines stipulated in the contract.


Q:What information do we need to provide to undertake the project?
A:Initial discussions require information such as site conditions, the type of materials to be stored, estimated storage capacity requirements, and dimensional constraints; the detailed planning stage requires site floor plans and geological data, and we can also arrange for a specialist to conduct an on-site survey.


Q:Is there safety assurance for the on-site construction? Is the construction team your own?
A:We maintain our own in-house construction team; all personnel are certified, strictly adhere to safety protocols, are equipped with comprehensive safety gear, and operate under a rigorous end-to-end safety management system. With no outsourcing or subcontracting involved, both construction quality and safety are fully guaranteed.

■ Contact Us

Submit

■ Related products